An Anvil Made from N&W Rail
NW Mailing List
nw-mailing-list at nwhs.org
Thu Jul 5 16:07:16 EDT 2012
(3) When did the N&W begin installing 85 pound rail?
-- abram burnett\
Abe:
It doesn't specify type, but the 1892 Annual Report indicates that
3.07 miles of 85# rail was laid on the Radford Division and that
74.94 miles of 67# rail was installed system-wide. A correction to
my previous post -- I believe the initials "PS" designated that the
rail was Pennsylvania STANDARD, not system. Harry Bundy
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://six.pairlist.net/pipermail/nw-mailing-list/attachments/20120705/5e444bff/attachment.html>
More information about the NW-Mailing-List
mailing list