Tonnage Ratinds and weather Reductions for locomotives
NW Mailing List
nw-mailing-list at nwhs.org
Wed Dec 19 11:42:15 EST 2018
John – Releasing the brake and then having to make a second application before the reservoirs are recharged requires a deeper reduction of the brake for the second application to have any effect. A sequence of these can create a condition known in the vernacular as “pi***ng away your air”. This can lead to nervous moments on a long downgrade, or worse. Weather doesn’t have to be cold for this to happen.
Let any engineer who hasn’t had this experience raise his hand . . .
Ed King
From: NW Mailing List
Sent: Wednesday, December 19, 2018 10:56 AM
To: nw-mailing-list at nwhs.org
Subject: RE: Tonnage Ratinds and weather Reductions for locomotives
Jimmy, If the engineer releases this brake application and then needs to make a second application relatively quickly . . . can a leaking trainline fail to recharge the auxiliary reservoirs throughout the train in time? If so then what?
Thx, John Garner
From: NW Mailing List [mailto:nw-mailing-list at nwhs.org]
Sent: Tuesday, December 18, 2018 8:17 PM
To: NW Mailing List <nw-mailing-list at nwhs.org>
Subject: Re: Tonnage Ratinds and weather Reductions for locomotives
On 12/18/2018 12:55 PM, NW Mailing List via NW-Mailing-List wrote:
3. And maybe decreased braking capacity due to leakage.
There is no such thing, at least not on a normal train [weird, oddball occurrences or trains sitting without air for long periods of time don't count for this narrative]. Quite the contrary!
If you don't know, unless a steam locomotive has at least a 24RL brake system, it has no "Pressure Maintaining Feature". What that means is that once an automatic brake application has been made to control the train downhill, let's say a ten pound reduction from 75 lbs. to 65lbs, the system has no way to maintain that 65 lbs. in the trainline. Consequently, if there is any leakage in the trainline, the brakes will apply even more. And, they will continue to apply and slow the train even more than desired until a stop is made or the brakes are released by the engineer. So, you can see the importance of having a tight trainline.
Jimmy Lisle
--------------------------------------------------------------------------------
________________________________________
NW-Mailing-List at nwhs.org
To change your subscription go to
http://list.nwhs.org/mailman/options/nw-mailing-list
Browse the NW-Mailing-List archives at
http://list.nwhs.org/pipermail/nw-mailing-list/
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://pairlist6.pair.net/pipermail/nw-mailing-list/attachments/20181219/469a67a6/attachment.html>
More information about the NW-Mailing-List
mailing list