Supplemental Air

NW Mailing List nw-mailing-list at nwhs.org
Wed Dec 19 10:47:13 EST 2018


It doesn't matter how long the train is. Even if it is just a short local, the yard crew can make up the train, install an EOT, make a terminal brake test, then put it on air and shut the engine down. All the reporting crew has to do is an on & off.

Jimmy Lisle

Sent from my Verizon Wireless 4G LTE DROID

NW Mailing List <nw-mailing-list at nwhs.org> wrote:

>________________________________________
>NW-Mailing-List at nwhs.org
>To change your subscription go to
>http://list.nwhs.org/mailman/options/nw-mailing-list
>Browse the NW-Mailing-List archives at
>http://list.nwhs.org/pipermail/nw-mailing-list/
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://pairlist6.pair.net/pipermail/nw-mailing-list/attachments/20181219/0e3c333c/attachment-0001.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: SIX_11AC065E-05C7-4082-9B0B-BA0C85CBEFF9.jpg
Type: image/jpg
Size: 831665 bytes
Desc: not available
URL: <https://pairlist6.pair.net/pipermail/nw-mailing-list/attachments/20181219/0e3c333c/attachment-0002.jpg>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: SIX_A16F60B6-6070-4858-A15B-6A079909D95C.jpg
Type: image/jpg
Size: 889034 bytes
Desc: not available
URL: <https://pairlist6.pair.net/pipermail/nw-mailing-list/attachments/20181219/0e3c333c/attachment-0003.jpg>


More information about the NW-Mailing-List mailing list