Foreign Interlockings
NW Mailing List
nw-mailing-list at nwhs.org
Thu Oct 6 15:40:01 EDT 2016
Talked to Landon Gregory today and he'd caught the Lovitt Avenue
assignment several times working the extra board. The primary
job of the Lovitt Avenue operator was to control the crossing gates. The
interlocking for the NS/N&W crossing was controlled by the operator
at Bridge 5. One note -- draw bridges were controlled by operators
on the N&W, but on the Virginian, the spans were controlled by
members of the Signal Department. Harry Bundy
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://pairlist6.pair.net/pipermail/nw-mailing-list/attachments/20161006/4fce2958/attachment.html>
More information about the NW-Mailing-List
mailing list