Other than in the two exceptions cited (grade crossings and sharp curves), were the first installations of longer sections of welded rail welded piecemeal from existing 39 foot rail, or was the jointed rail simply replaced with new, continuous rail?
Matt Goodman
Columbus, Ohio
On Nov 29, 2010, at 11:27 PM, NW Mailing List <nw-mailing-list at nwhs.org> wrote:
> They went from the crossings to laying "78"s in the sharper curves.
>
> EdKing
>
> From: NW Mailing List
> Sent: Monday, November 29, 2010 5:10 PM
> To: nw-mailing-list at nwhs.org
> Subject: Re: Welded Rail
>
>
>
>
>
>
> One Magazine article that I do remember reading told how the N&W was welding two 39-foot rails into 78-foot rails to eliminate one-half of the joints. I think this was probably preliminary to the first installation of longer strings of welded rail.
>
> Gordon Hamilton
> Many roads installed 78-foot sections in road crossings to avoid "pumping" caused
> by vehicular traffic. The 78-foot sections were usually "field" welded on the spot.
> Harry Bundy
> ________________________________________
> NW-Mailing-List at nwhs.org
> To change your subscription go to
> http://list.nwhs.org/mailman/options/nw-mailing-list
> Browse the NW-Mailing-List archives at
> http://list.nwhs.org/pipermail/nw-mailing-list/
> ________________________________________
> NW-Mailing-List at nwhs.org
> To change your subscription go to
> http://list.nwhs.org/mailman/options/nw-mailing-list
> Browse the NW-Mailing-List archives at
> http://list.nwhs.org/pipermail/nw-mailing-list/
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://six.pairlist.net/pipermail/nw-mailing-list/attachments/20110626/3a13031b/attachment.html>
More information about the NW-Mailing-List
mailing list