super-elevation technical questions
NW Mailing List
nw-mailing-list at nwhs.org
Sun Oct 3 20:33:23 EDT 2010
Greetings!
As I've probably bored you all before, I model the 1930's era. I'm doing the super-elevation aspects on my mainline, using balsa strips under the outside rails and sanded down to level on the ends as the mainline straightens out. I guess John Armstrong would be proud.
My question has to do with sidings which parallel the mainline.
Do they also put super elevation on them?
Is super-elevation only done when the speeds on the siding are above some speed like 25 mph or so?
When a turnout is on a curve, and the siding is on the outside, It seems logical that the spur would be super-elevated as the turnout would technically need to be flat, so the spur would be at a higher level than the mainline.
Also, how far from the track centerline did they put the signals?
I'm using a combination of semaphores(scratchbuilt) and Intermediate Block (Oregon) signals.
How high up did they put the bottom target, or semaphore on the poles?
Mark Lindsey
y3a at earthlink.net
More information about the NW-Mailing-List
mailing list