 Ron et al:
I should have added that track does still buckle, even with that 18" "shoulder" they now put on the "field" sides of the ties.  
That's why most railroads put out a "heat patrol" vehicle when the ambient temperature rises to 90 degrees.  Those heat patrols find a lot of little stuff... track that has moved four, six or eight inches laterally, before the movement is stopped by the weight of all the ballast stone.  Then a 10MPH slow order is put up for the night and the next day the section gang brings in a torsion beam to straighten out the kinked track, and a ballast regulator to get the stone back in place.
In 1999, I was riding Amtrak's Zephyr from San Francisco to Chicago when the UP slapped a 50 MPH slow order on their entire system (the temperature was 107 degrees in the desert that day.)  My train was five hours late into Chicago, which meant that I missed my train over the wonderful B&O to Martinsburg and was obliged to ride that awful old PRR to get back to Pennsylvania !
-- abram burnett
-------------- next part --------------
An HTML attachment was scrubbed...
URL: http://six.pairlist.net/pipermail/nw-mailing-list/attachments/20061004/7d30ab8e/attachment.htm
    
    
More information about the NW-Mailing-List
mailing list